You must be logged in to rate content!
4 minute(s) of a 56 minute read
9-17-2009
Some more paint, and played a little game of just the tip..
Thank you UPS..just in time. (165/45/15)
09.18.09
5" 944/Bus Drop Spindle..
5" Narrowed Adjustable Beam..
..tomorrow starts at 7am.
09.19.09
..popped in from Buses to take a shower after today's long ass events. Huge thanks to my two special helpers..most definatly couldn't of gotten it done without you!
So, upon raising the beam from full slam-o-matic, the shift linkage operation has become hindered and I haven't been able to get enough clearance to shift into reverse. There are no shocks up front currently, but I opted to go for some gas ones. I have a couple other parts to replace before she can hit the road again. Also still waiting on my adjustable spring plates..
11.04.09
So it only took 5 weeks to come, but I finally got the rest of my parts in today..fricken redick!
Here is the main jazz:
I mocked it up, and said to myself..shoot, we need to get even lower back here! So I modified the arms a little more..before and after.
With them all the way compressed, they match my frame clearance; 0". The little adjusters will allow me to fine tune..
Other then that, got the rest of the parts to mount up the larger dual master. A quick flush and they should be good to go.
..just in time for snow to hit.
11.06.09
So, the deed is done!
This is where the muffler used to sit:
..and now:
I should mount a small digital camera to the end of this steering box..I'm sure it would be a scary video..pry wouldn't last too long.
Overall, I evened out the rake..mission accomplished. Front to back, I'm still raked about 1.5". Maybe tomorrow I'll pull it out and get some better pictures.
She’s a beauty
Posted by miatamatt on 3/25/21 @ 6:31:57 PM