You must be logged in to rate content!
6 minute(s) of a 233 minute read
2-13-2011
Today i spent more money e-bay!
2/15/2011
2/19/2011
Project update:Almost finnished all the new electric on the car.It was nice to take out the old fusebox.I also put the new HR swaybar in front.
2/24/2011
2/25/2011
Little more pic of the exhaust: 3" to dual 2,5"
Some pictures of the oil pipe
A very nice suitcase from e-bay
And a picture of me in my sofaVery funny instruction manual :-)
2/28/2011
Thanks.Someone told me where do i find custom spark plug connectors and custom ignitions wires(leads)? This have to be extra long and must fit the electromotive coilpack. This is to short and the connector is to small for the tec gt coil
3/5/2011
Today i mounted the radiator for water intercooler:
Pipe for fuel:
A picture of my beautiful island where i grown up! Sandsøy in Westcoast of Norway .New York right ahead in the west
Today some progress on the car.Water intercoler is mounted and pex water pipes
-mounting the tps sensor
-Fuellines almost finnish
-Wiring of the engine is started.
tomorrow i finnish oilfeed for turbo,waterpump for ic and custom spark plug wires, if i get them by the postman.
Ill try to take some pictures tomorrow
3/8/2011
Today i ordered new silicone house.Im not satisfied with this sollution.Someone have a idea about a better place for the dump valve?
And today:Water and fuel line is finnish
3/15/2011
There is 2 small expansion tanks.one for water intercooler radiator and one for mainradiator .
Under the car is total 5 pipes. Vacuumpipe, 2 mainpipes to radiator and 2 smaller pipes for water ic.Next season im gonna change the floor.
3/20/2011
epic!
Posted by CCmyVW on 1/26/20 @ 4:46:18 PM