You must be logged in to rate content!
12 minute(s) of a 221 minute read
4-10-2013
Redlines looking sexy
Got the Trunk Mounted Battery finished
Then Xene and I started working on the Walbro 392 (255LPM inline)
Instructions.... ____ that!
Walbro 392 (255 inline)
Steel for bracket
Lets bend it so it fits the Gas tank with out rubbing on it
Fits
Bracket getting drilled
Test fit bracket on Gas tank
Test fit Bracket with fuel pump
Test fit it all, fits perfect
Lets paint her
fuel pump relay
Painted and ready to fit
Then we started the exhaust down pipe, got the flange in the mail
Fits perfect
Going to take a 2.5 pipe, and weld it and start fitting it down between the rack and firewall
thats all folks!
i have a deadline I have to have it done before 5-25-13
4-11-2013
Today's check list was pretty good!
Fuel system- DONE
Brakes- Done
Seats- installed
Exhaust- IP
Fuel systems:
wired up the negative lead from the battery neg post
Positive and negative, drilled a hole and threaded them through
Wired it up to the fuel pump, connected all the fuel lines, tightend it all down, and done!
Yeah fuel system done, CHECK!
Finally got the rear brake line, flared the hard lines, and wired it up, front and rear brakes are done!!!
Got the Recaro seats in, driverside bracket is done, drilled and bolted down!! SEATS DONE
Privacy hatch latches, since i keep having to get to the battery, i hat the privacy hatch string bolted down, and it was in the way and a pain, so I made some easy latches to take the privacy hatch on and off with ease.
all done
started working on the exhaust, to test fit and figure out how to avoid the steering linkage
cut pipe
it got late so i could grind anything smooth or i would piss off my neighbors, so the cuts dont look too great. but they will be fixed
Cut the reducer for the flange
Test fit
Still need to finish:
Digital Dash
Driveshaft
Exhaust
4-14-2013
Me too!!!
Started to make a custom radiator support mount, so it will actually be supported since this one does not.
Got a piece of steel, measured it out
Drill it
Radiator has 2 12inch fans, hope the flow enough
got mounts with a few washers, and nuts and bolts, just going to drill a larger hole that fits the radiator, use some bushing and the cooling system is all done.
ARP extended wheel studs came in
started labeling all the wires on the back of the digital dash, what a pain, but at least its strait forward thanks to these links.
http://www.sr20-forum.com/interior-e...-b13-se-r.html
http://www.sr20-forum.com/audio-elec...ster-info.html
Monday I am calling a few driveshaft shops to see if they can make me one that will fit the MA47 rearend and the SR20 transmission
Finished up wiring the LED USDM lights, they are for sale now, since I will do the same thing, but maybe a little different with the redlines
http://club4ag.com/forums/viewtopic....p=22903#p22903
Driving Lights
Braking lights
4-17-2013
Thanks, ya kinda reminded me too, know that you mentioned it!
Tried inflating my stretched tires at home all the DIY way.... and ya kinda failed epicly...
Painted my custom Radiator support to save it from rusting
Hair spray
Spray inside and on the lip..... let it vaporize.... ya kinda just caught the tire on fire hahahah... had to use a coke to put it out lol.....
Tried strapping the tire down around the lip and using my air compressor...
Ya no go would not make a bead...so sad face
Started to mock up brackets for the Digital Nx1600 Dash to fit into the AE86
got some metal
drill it
Mocked it up with the stock mounts
Test fit
Add a splash of color, and rust protectant
Bolt it in
Now time for the left side bracket
mounted
Yeah it fits, need to bolt down the bezel mount so its not lopsided lol
Downpipe is getting closer too.
Xene tac welded the first part of the downpipe.
Test fitting the angle
Drilling a hole for the O2sensor
Cutting an angle
A little more angle and a right turn at the bottom to avoid the steering linkage
Test fitting
We cleared it!!!!!
Time to weld it all up, got a V-Band coming in tomorrow!!
Wow amazing!
Posted by Diggymart on 11/1/19 @ 3:00:13 PM