Cut some more of the inner fender out on this side today and got a flange and tacked on a support piece..... It is starting to look like something!
4/11/2009
More pics of the progress..... Wastegate feed is just tacked for fitment purposes and actually needs to be rotatated etc, Hard to see in the pics but look at the deadly sweet fit of that 3" pipe to T4 flange.
Pics also show the tire clearance with the suspension all the way up and wheel at full lock
Hoping to work on it some more tomorrow.
5/12/2009
got the turbos back from coating, they came out AWESOME... even smoothed off the " master power" on the compressor housings., I am pretty happy with how it is turning out I just need more time/money lol
5/19/2009
Well here is some more slow,ugly progress but at least it should work decent when its done.... I hope!
Cold side mocked up out of intercooler, with Blow off mounted and meth nozzle installed
Hotsides done, Pressure tested, wrapped etc.
Cold side out of turbo into Y pipe 2 x 2.5" into a 3" into the cooler
Gotta finish the cold side/downpipes then figure out how I can box the engine bay back in.
Nice build with pics