You must be logged in to rate content!
3 minute(s) of a 183 minute read
2-13-2012
Got a bunch of work done this weekend despite falling into a pile of scrap metal and getting some puncture wounds in my arm lol
Welded tubes onto the cage to run the parachute cable through:
Then built a little brace for the pedal box:
Then we made some room for the intake/throttle body/piping LOL
Got it all seam sealed up and primed:
Then Nolan finished up this super bad ass Carbon Fiber tube protector, this is not one of the generic bickel ones this is a one piece custom built one and its BA
This is great!
Posted by Diggymart on 11/3/20 @ 5:48:21 PM