You must be logged in to rate content!
5 minute(s) of a 417 minute read
12-31-2011
Measuring time, inner cylinder. 6 measures, 2 measure ca 10mm from top, 2 measure ca in the middle and 2 measure ca 10 mm from bottom.
Crank, 2 measurements:
After the cranks measurements was approved, I was measuring the clearing of bearing shells with Plastigauge.
Too few pics here, sorry.
Dirty piston, before cleaning.
Pistons and crank are in, new rings and bearings...
Oil sump pan... Waiting for a new Oil pump chain
A lot of parts that needs cleaning...
Transmission brought down from attic. The old one was broken, the "new" one is a Dogleg box rom a E28-Hartge. I do not know if that is true, but does not matter anyway. The dogleg-box is not optimal for the turbo-engine anyway.
Small details, all the way...
Nov 2011
New steering wheel.
Original rubber brakehoses, because the local authority won't approve steel brake hoses.
Misc...
Old washer tank, was not too bad though..
Looks better with a new one...
some small parts
New clamps for the ABS linings, the old ones were melted
Pernezz mounts new throttle wire...
New protective cover ++:
Visiting the paint booth:
Some small "adjustments"
There are still some work left on the door, looking forward to see in on...
Fuel cover...
Some of the details mounted...
Temporary mounted...
Looking like a car now?
All new original BMW-parts...
Love the Bimmers!
Posted by Diggymart on 1/26/20 @ 11:36:41 PM