1929 Chevrolet International - 4 Door Sedan Project by BearsFan315

By diyauto
( 5 )

3 minute(s) of a 636 minute read

7-15-2019

got around to re assembling the front trunion assemblies and installing them back on the car. everything went together nicely, and put a little bit of high temp brake grease on the components that have to swivel, rotate, or move. they look great and installed nicely. used all new hardware. used new springs from The Filling Station, they are NICE and tight !!  next will be to install the bearings and then the front hubs, and wheels. at that point i will be ready to reset the brakes. i will adjust all four corners to be safe. i have the tool to set them so that is a plus.



new brass nuts on freshly machined rod ends



aluminum blocks installed, these are from C&P Automotive (Billy Possum) very nice work on them



installed on the swivel first



pin installed in leading hole



plate installed



screw and washer installed to hold plate



aligning rod to slot and pin



pin pushed through rod end



another view lined up



cotter pin installed

now ready to go back on the car, had to assemble the drivers side and passengers side


installation on the car went smoothly, 2 screws hold it in place, i did a pretest fit before to ensure everything would fit nicely.



trunion assembly installed



backside



other view



shoes and new spring installed



front brake side 1 complete


installed my front wheels back on the car last night. packed a little more grease in the bearings and on the spindle. i previously cleaned and repacked them the first go round, and car has not been driven. installed new cotter pins as well.



Comments

Great car !

Posted by Diggymart on 9/7/19 @ 3:48:57 PM