You must be logged in to rate content!
2 minute(s) of a 34 minute read
6-20-2011
Thanks guys, I am glad all are as excited as I am!!
Yes, it's a combined build between 3 major shops.
Lutz is doing most of the work. I was in their shop before I left and they were building the first twin turbo 350z in Florida, a 700hp e92 m3 and redoing a build on a older m3. THey had 3 ferraris out back and they do quality work.
A different shop is installing the bags but my buddy at lutz will clean it up with the trunk install.
Also a diff shop is handling my paint work.
Oh and my other buddy Justin at redline designs is doing my carbon wrap on my interior pieces.
Schedule completion date is 2 and week of July.
I will post the pics as soon as I getting them in
6-21-2011
Alright so the parts are wrapped and m wheel came in. Thanks Redline Design, justin and lexTuners!!!