Project: Trizz'l Vee Dos.. by n0ftInc

By stevegolf
( 4 )

3 minute(s) of a 92 minute read

4-22-2007

With all the major components sourced we had much fabrication to do. Joe started on some of it yesterday.


Made this power steering reservoir bracket to bring it out of the way


Tucks up as far as possible


Once we had the location of the IC figured out I ran some string to mark the spot


Did my best to measure everything so that it was centered/angled correctly. Once that was done I made the little square frame. This will be the platform the IC sits on. Later it will have tabs that the cooler will bolted onto. 


With it in position I tacked up some rod to hold it firmly while the actual supports were made. Then went to work on the actual mounting. Here's one of the mounting points. A beefed up transmission bracket.


Things all tacked together. Note the temporary rod has yet to be cut out.


All done


A strength test. Holds up well which is good cause that IC is pretty dang heavy.


Safe and secure!

 


05.07.07

Getta ottah hur..!


Joe's box..


Onward to this afternoon, we brought her out into the light..


..and off she goes!

Weeeee..!


Should be a good week. 



Comments

Top notch work! Would love to hear that VR with the blower!

Posted by MPower on 10/31/20 @ 3:10:47 AM

Wow this is ?

Posted by Diggymart on 10/29/20 @ 11:21:51 PM

Beautiful! probably one of my favorite Corrados!

Posted by stevegolf on 10/29/20 @ 1:59:11 PM