You must be logged in to rate content!
3 minute(s) of a 92 minute read
8-19-2007
After the first attempt got destroyed because of some glue misplacement, I went ahead with round two of finishing the tank.
Friday I picked up some SS Hardware and flew as fast as my little dzl could go home to install. Upon getting through 3 or 4 of them in, I just wasn't feeling it, so it was off to ACE for some overpriced Chrome.
A little bit more glass and some time and boom..all capped up.
Either or, it's all set..
..and how it will fit with the rear tray..
A few other things has been happening at Joe's with dealing with wiring, more metal fab, and the exhaust, but I haven't gotten a chance to get pictures.
09.09.07
So, yesterday I went and picked these up from Full Blast..
They turned out really well. My only real concern was the time frame he originally gave me, but it wasn't a big deal. I seriously can't tell the difference between the four.
Here are the new set of 195/40/16s T1Rs mounted..hopefully I can get a little bit lower than last year running the smaller series.
If anyone is interested in getting some wheel repair done, I recommend giving Todd a call and having him take a look..he was a nice guy and his pricing was super fair..616.893.1917.
09.11.07
Wiring in the front is all set and ready to go..
The rear is almost there..
10.20.07
So close it hurts!
Top notch work! Would love to hear that VR with the blower!
Posted by MPower on 10/31/20 @ 3:10:47 AM