You must be logged in to rate content!
3 minute(s) of a 92 minute read
9-18-2009
I got the Z06 cam, trick flow double timing set, melling oil pump installed. I had to grind a little on the front cover to get it to fit but its on now along with the water line fittings. I also started on the wiring harness.
9-21-2009
Vette Powered said
Wait a minute! This thing is going to be a street car??!!
It will see some street action but alot of track action. The car is on drag radials. There is a local competition (that I hope is still around next season) That requires you to make a 30 mile drive to the track then race. I'll take it to work once and a while too. hehe.
there is the newest update:
I put the windage tray, crank sensor, and oil pan on. I was putting the flex plate on when I discovered the motor was hanging up on something internally. I have been checking as I go along so allot of cursing in sued. After rechecking the windage tray and disassembling it. I discovered that the crank sensor was hitting where the machine shop had welded in the weight when the crank was balanced. I ground it down and now everything is happy again.
The first customizing hurtle has arrived. The bracket for the alternator I have was intended for an aluminum ls1 block and doesn't fit the 6.0 iron block. The iron block is missing the location for a bolt I have labeled 2 and a I needed to drill and tap location 1. I was able to modify the bracket I had by adding another arm going to a bolt location on the head.