You must be logged in to rate content!
2 minute(s) of a 255 minute read
2-3-2019
New rubber parts for the wiper motor:
Instrument panel connected - the wiring as built in my car is very different than the wiring diagram:
The instrument panel installed. Ventilator switch is now mounted on the dashboard rather than the SOFICA heater box:
2-17-2019
The Dynamat party is over. Onto the electric washer pump (mounted under the dashboard) next and then the steering column + pedal box will be installed in a week or so.
2-28-2019
Last bit of work done at Victoria Plating Ltd:
The 4 holes that a previous owner had punched into the sill/rocker panel embellishment strips when the captive bolts rusted off decades ago were welded shut and the outside was polished so this patching work became invisible; the two upper rear fender trims were de-dented and then polished; cadmium plating on the headliner trim panels which are covered with soft headliner material. This was done because they could rust as the originals did and that distorts the fabric as the iron oxide builds up; and finally the hardware for the handbrake components under the car were replated in yellow cadmium.
Wow a labor of love. Great!!
Posted by Diggymart on 9/7/19 @ 4:02:23 PM