You must be logged in to rate content!
2 minute(s) of a 66 minute read
1-20-2013
right bit of an update managed to get over to see fred at minishells, and finally got my load bed floor!! so with that in mind we needed to clear some room so we could start laying out panels and start roughing out the fit of the loadbay to the floor pan.
so we did this:
with the pickup in half and stashed in a corner we started laying out the panels and starting the trail fit
we didnt manage to get the wheel arches, rear valance and h frame closing panels from fred so hoping to sort these out next week and then we can start getting everything lined up straight and welded together!
1-25-2013
slight update this evening i set about making a jig for setting the height of the wheel arches on the new loadbed the jig was set up on our other pickup!