You must be logged in to rate content!
3 minute(s) of a 106 minute read
3-13-2012
Hi danny1
Yer it looks like I will have to send the head away to have the valve seat re-cut, I've decided to use Rob Walkers Engineering firm to carry out this work. So I will pack up the head and send it away in the next few days, still lots of work to be getting on with.
My package from minispares turned up, so I fitted a new comp water pump with new bolts along with a steady bar kit which fits onto the water pump.
Fitted the timing cover oil seal (what a pain in the arse) I think the powder coating on the timing cover did not help, after a lot of swearing trying to get the dam seal in place I sanded the area around where the seal fits, that couple of mm made it possible to fit the seal.
I also test fitted the support for the sensor bracket on the timing cover and fitted the alternator, as well as fitting solid engine mounts.
I thought that since I had the kad bias set up I could do with a bit more clearance, so i fitted a different breather.
Picked up my inlet manifold which I had asked my mate Adam to fit the barbed fittings for the Megajolt.
Adam is a star when it comes to even thing to do with metal, I have had theses stainless steel clamps kicking around for years, they came off an Aston Martin exhaust system, I kept them as I could not see them go to waist, of course these clamps were far too big for a mini exhaust system, so I got Adam to alter them so they would fit :)
I should be fitting the engine (minus the head) back into the car this weekend, so expect some more updates very soon.
Great rally car!
Posted by Diggymart on 10/2/19 @ 8:33:46 PM