You must be logged in to rate content!
2 minute(s) of a 160 minute read
5-30-2007
went to torque everything up today and stripped the thread on one of the oil level sender bolts so I've had to tap it out a slightly larger size. Apart from that tho, it is all back together with new sump gasket, ready for some oil plus overfill.
5-31-2007
filled it up with oil today and completed the first stage of making some decent inner arches. I layed up over the studs I had made.
6-2-2007
I then removed the suds that were too short from inner arches mk1 and and matched them up to the longer studs form inner arches mk2.
I then super glued some CSM to the longer studs, to keep it in place.
...and then aplied the resin.
Despite this the CSM didn't stay where it should, but at least I have the general shape sorted and fixed to the studs. Once dry I will seperate the old sports pack copies and bin them, the tidy up whats left and lay on loads more matt and resin for strength.
Very cool build!
Posted by Diggymart on 2/5/20 @ 8:09:06 PM