You must be logged in to rate content!
3 minute(s) of a 137 minute read
2-21-2012
Got with Beer99c5 and came up with one hell of a panel I must admit im overly impressed on how quick he did it and how the finished product turned out way above my expectations!
Template render
Finished Product
Now I can go ahead and wrap up the meth install along with linelock, trans cooler and Hobbs switch bypass! Once again thanks Beer99c5!!!
2/26/12
Got the rack back on with the billet spacers.
Everything lines up perfectly and clearances look good!
Did a lot of cleanup wiring work around the engine bay that I didn't take pictures of but I have pretty much put a lot of hours patiently making sure all wiring is soldered and heat shrinked.
Assembling the 2 relays for the trans fan and ewp.
Got the beer panel all wired up and done!
Cleaned and prepped all ARP hardware and put lifter to soak in oil
Gauges all wired up and they work GREAT!
Routed the trans cooler lines
Had to space out the rear sway to allow for free movement!
Finished up all electrical stuff inside the car and put it all back together. Also did sheetmetal wok on the tunnel and everything came out perfect!
You can see were I put the PAC controller for the Alky system
The command center!
A quick video of how everything works and looks!
http://api.viglink.com/api/click?for...13484404729881
From this
To this!
2/29/12
BOOOOM!!!!!!!!!!!!!
What a beast!
Posted by MPower on 11/25/20 @ 10:58:11 PM