You must be logged in to rate content!
3 minute(s) of a 391 minute read
9-4-2012
Picked up half a stick of 1 3/4 .120 tubing today to play around with. I decided to make two bars to connect my A and B pillars in the middle to match the B to C bars. This is my first time really fitting and notching tubing so it's good learning! Cutting and notching the bars was pretty easy, I can see why a good notcher would be cool to have though. Way faster and cleaner. I was DETERMINED to make sure my welding went better on these bars than it did last time. It went better but not much! I was smart enough this time though to lay off the trigger and just stitch it together with the intention of grinding it down for cosmetic uniformity.
I was able to fabricate the bars, weld them in and clean up the welds pretty good in 3 hours. Not bad I thought. I just have a little more cleaning up to do on the joints, some sanding and finally paint tommorow. All in all it went well! Sport Cage is done........ well until I decide to build a real one.
Raw materials... did you know they make you buy 10ft. minimum!
First bar being notched....
First bar fitted..... now to copy it.
Pretty good fit up...
Both bars set in place
Looks like it belongs...
Wow this is something!
Posted by Diggymart on 12/1/21 @ 7:43:28 PM