You must be logged in to rate content!
2 minute(s) of a 255 minute read
5-29-2020
No actual work has been done on the 404C for a couple of days but today I ordered:
- a new old stock camshaft (specific to the KF2 Injection engine) from Loewendoctor in Germany;
- a set of 8 new lifters from Alvéas in France;
- a timing chain tensioner also from Alvéas.
The cam was very expensive but I think a new old stock cam will be better than any regrind.
A few weeks earlier I ordered new navy blue lap belts for the car, which should be here really soon.
And a bit after that, some SEV Marchal spark plugs in NOS for the KF2 Injection engine is on its way from Italy.
I hope that's the last of the new parts I will need to get the engine back in shape. I expect to get both in the next few weeks.
6-1-2020
6-5-2020
I thought I'd treat the engine to a set of period spark plugs. This set came from Italy, S.E.V. Marchal 35HS.
6-7-2020
Yes, I have 8 NGK BP7ES on the way and I'll use those and save these for the historical value.
Painted the mirror body and mounted it today.
Wow a labor of love. Great!!
Posted by Diggymart on 9/7/19 @ 4:02:23 PM