You must be logged in to rate content!
2 minute(s) of a 241 minute read
5-17-2016
The work continues, started today by making the scraper to mark where to cut it, then i cut it, then i marked and cut the peugeot gearbox flange, i plan to use the top two bolts, crank sensor, starter and left lower bolt, that leaves me to use only one of the original gearbox bolt holes, next thing to modify is the input shaft, i need to cut it at the bearing surface, and turndown the the splines to 15mm, tomorrow have to figure out how to turn it down, do not want to disassemble the gearbox and the spans are hardened steel, ones i do that the gearbox and engine will meet flash more to come.