You must be logged in to rate content!
3 minute(s) of a 31 minute read
2-27-2012
Today I finished a lot of the interior paint work, also finished up the front fender wells, the headers are installed and were a great fit, the magnaflow kit is in, the radiator should be here wednesday, and I am hoping to have an Art Carr 200R4 next week, at that point my rolling chassis will be almost complete.
3-5-2012
Core support repair and install,
After taking the core support to powder coating I assume when it got sand blasted it unconvered several rust issues, we had to replace the mounting tabs on the drivers side, build a battery box and replace quite a bit of metal in the battery box area.