You must be logged in to rate content!
4 minute(s) of a 44 minute read
10-22-2012
well here are more pics of the build trying to get everyone up to date, new quarters, trunk floor, tail panel, deck filler and upper window channel. Here you will see pics of the entire rear end coming together as well as drip rails being done and some work to the side firewall panels
well here are some more updates on the rest of the drip rails, smoothed firewall
well here as you will all see please give me your inputs are pics of it getting its first coat of primer, while all this was going on interior, chassis was completed and engine is getting worked on as well, got a lot going on at the same time, please give me your input, thank you
Incredible job!
Posted by stevegolf on 1/7/21 @ 3:54:50 PM