You must be logged in to rate content!
2 minute(s) of a 206 minute read
12-30-2012
Tom and I and ready to tune it for power. I've been pretty busy through the Holiday's so we will probably do that this week.
Grimmspeed 3 port mounted:
WG is going to be dumped out the hood vent. I still need to slash cut it so its flush with the top grill. It will sit directly under with less than a MM of clearance. I don't want it sticking out the hood.
The last thing to do is make this this into 2 pieces or possibly 1. Below was only used for mock up and to get the car on the road. Pretty much just threw crap together I had laying around the garage...
Before spring the catch can setup with be ditched and i'll have a new setup that mounts behind the driver side headlight. I will also be venting the block from the balance shaft inspection hole.
1-9-2013
Got the lower IC pipe finished. All that's left to do is slash cut the dump tube lol.
.065" wall aluminum
DIY bead rolled the ends with a $2.50 2.5" muffler clamp and a washer + vice grip...
Much better!!!
For those interesting in the bead rolling:
http://www.dsmtuners.com/forums/cust...bead-tool.html
Great build!
Posted by Diggymart on 11/20/19 @ 1:36:05 PM