You must be logged in to rate content!
2 minute(s) of a 206 minute read
9-18-2012
Haven't gotten it back yet. Hopefully soon
The machine shop has the block and all my parts. I should have it all back early next week.
Recap of what they're doing:
Hot tanking the block
Magnafluxing
Boring .020 over with TQ plate
Surfacing the deck
Line honing my main journals for the ARP main studs
Blue printing
Balancing the internals
9-20-2012
Got the head back today from Curt. This has to be the nicest port work I've seen.
9-28-2012
Got my clutch today. It is the QM 8-leg street version. I chose the street because the car mostly see's the street, and it will still hold whatever power I throw at it Ordered through TSCOMPUSA, thanks for the killer deal.
Also got a few other things I needed for getting the engine together:
STM balance shaft delete kit
STM oil cooler delete kit
Gates waterpump
OEM headgasket
Various other gaskets/seals/etc.
The machine shop said I should have the motor back by the end of this week. Hopefully its ready tomorrow so I can assemble the motor and get the engine/trans back in the car this weekend.
Great build!
Posted by Diggymart on 11/20/19 @ 1:36:05 PM