You must be logged in to rate content!
2 minute(s) of a 88 minute read
11-9-2013
Yes a lot of hours gone into this wee project. Probably put 5 solid days into it, with all the changes I had to make to get it right.
Here it is painted and ready to go back on.
Once I clean the internal parts of the oil pan and assemble, I can drop it on the motor and then work on getting it back on the dyno next week. Hopefully with better oiling.
Cheers
11-10-2013
Thanks Steve
Always good to hear positive feedback from the pros
Well almost there
One last look at all the goods
Good to go
Cheers
Nice pics!
Posted by Diggymart on 5/12/20 @ 2:53:28 PM