WarShrike's Project Thread by WarShrike

By diyauto
( 3 )

2 minute(s) of a 86 minute read

12-15-2015

Finally got the spindles opened up to accept the MASSIVE CTS-V 6-piston brakes. Spindles are currently drying from a few coats of primer. While waiting on that, I prepped the UMI Performance Inc. front control arms and loosely installed them in the k-member and pointed the zerk fittings out to where I could easily service them.

Still waiting on a set of 18" wheels, have to send out my injectors to get cleaned and a list of other items. A whole lot less boxes filled with parts though. This thing is getting closer...




12-16-2015

Not blazing through it, but getting some of the finer points taken care of. Finished spraying the spindles, should be able to install those sometime tomorrow.



Finished connecting some of the harness to the trans. Installed the longtubes for a temporary fitment check with the new exhaust. More on that soon.



Test fit the UMI A-Arms, they're pretty nice, and finished setting up the Global West upper control arms that were modified by Blaine Fabrication.




Kinda got stalled on a few things that took longer than I had really hoped to, but it's down to just chipping away at it all now.

I need to find longer shock bolts for the A-arms, I forgot that I had read a thread awhile back, so I need to go to the local hardware store tomorrow after work.

Exhaust is just loosely mocked up, will install rear end and stuff when I get a chance in the next few days.




Comments