By diyauto
You must be logged in to rate content!
2 minute(s) of a 122 minute read
3-16-2013
Picked up the intercooler today. DNA Powder coating did an amazing job.
Cant wait to get it in the car.
3-23-2013
Install of the new pullies w/new belt, radiator w/new hoses, turbo coolant lines, and battery hold down begins. Sorry bout the blurry I-phone pics.
3-26-2013
Install of the PR air pump eliminator pulleys w/new belt, CSF radiator w/new hoses, turbo coolant lines, and battery hold down all installed.
Read the Full Article:
http://www.rx7club.com/build-threads-292/silver_7s-94-rx-7-build-1025205/